The Changi Airport Terminal 3 was given the go ahead in 1996. The Terminal 3 finally became opertional on 9 January 2008. It has 28 aerobridge gates and 8 of them capable of handling the Airbus A380.
Taken on : 15 Nov 2007
Advertisements
June 6, 2008 by laokokok
The Changi Airport Terminal 3 was given the go ahead in 1996. The Terminal 3 finally became opertional on 9 January 2008. It has 28 aerobridge gates and 8 of them capable of handling the Airbus A380.
Taken on : 15 Nov 2007
nice perspective man… i toyed with the idea of doing a photo blog kind of thing, but i’m just so lazy.
glad that there are people out there doing it though!
Thanks Mavis. I’m lazy too but think juz carry on whenever I’m free.